;

“Health First” Project



Through TIKAV’s coordination, in 2018, we brought to life the “Health First” Project in 17 different locations across Turkey financed by Akfen Renewable Energy. These locations have been chosen due to Solar, Wind and Hydroelectric Plants being there. The project aimed to raise awareness regarding first aid, fundamental health, cancer screening, routine checkups, gynaecological diseases and organ donation to women over the age of 18. In addition, it aimed to support women in learning about wrong health interferences by those who are unprofessional in fields of medicine, break down prejudices and teach them about the importance of early diagnosis when it comes to gynaecological diseases.

Within the scope of the projecti 1500 people were reached in 17 different locations.

Proje kapsamında gerçekleştirilen 17 çalışma sonrasında 1500 kişiye ulaşılmıştır.


In the participation of women aged 18 and over organized program; Amasya GES (Amasya); Çalıkobası HES (Bulancak,Giresun); Çamlıca HES (Yahyalı, Kayseri); Demirciler HES (Kale, Denizli); Doğançay HES (Geyve, Sakarya); Doruk HES (Dereli, Giresun); Gelinkaya HES (Aziziye, Erzurum); Kavakçalı HES (Ula, Muğla); Otluca HES (Anamur, Mersin); Saraçbendi HES (Gemerek, Sivas); Sekiyaka HES (Seydikemer, Muğla); Sırma HES (Bozdoğan, Aydın); Solentegre GES (Elazığ); Tokat GES (Turhal, Tokat); Yağmur HES (Köprübaşı, Trabzon); Yaysun GES (Ereğli, Konya); Yeşilvadi GES (Acıpayam, Denizli) was implemented.